Skyline Apartments

Denver, CO
Overview

The Skyline Apartments project was a renovation to the first floor, roof and patio areas. The space featured  a new leasing center, yoga room, fitness gym, game rooms and a demonstration kitchen. All new HVAC systems and equipment were installed along with first-floor electrical upgrades. A 15' Nana Wall now runs from the demonstration kitchen to the outdoor patio. The roof portion of this project consisted of renovation and additions of new patio space and lounge facilty on the existing 12th-floor roof. Highlights included new structural reinforcing slab 4 inches' to meet new required design load of 100 sf, all new roofing and waterproofing membrane over entire roof, new lounge mechanical systems, extension of plumbing and fire sprinkler and fire alarm systerm per code requirements. The new 2,500-sf patio has gas fire pits, grills, a custom bar, specialty canopy lighting and amazing views of the mountains.